Modular Sports Pavilion for the University of Greenwich

Home / Case studies

Case Study · University · 2017

As part of the University of Greenwich’s sports strategy at the Avery Hill campus, the university needed a changing facility to serve the variety of sports played there, with a medical area, an accessible shower facility and storage for essential equipment.

Project Details

ClientUniversity of Greenwich, Avery Hill campus
Building30ft x 72ft nine bay pavilion plus 20ft x 8ft self-contained unit
Facilities4 team changing rooms, accessible toilet and shower, medical room, storage
Year2017
Installation2 weeks from delivery to handover

What We Installed

Working with the university, we designed a nine bay modular changing pavilion with four team changing rooms, plus a single self-contained unit housing the medical room and an accessible shower. The ground workers lowered the foundations so the building sits flush with the surrounding tarmac, which both looks better and keeps every entrance step-free.

We liaised with the ground workers, project team and pitch provider throughout, and the whole installation from delivery to handover took two weeks, within budget and on time.

What the Client Said

“A rigorous process of detailed design led to the commissioning of the changing facility as an integral part of this sports pitch development. The facility proved to be of a high standard and there have been no quality issues since installation, which was logistically managed to precision. The University is quite rightly very proud of this initiative.”

Chris Andrew, Client Lead, University of Greenwich

Planning a Similar Project?

Tell us your site, team count and budget, and we’ll recommend a floor plan and confirm a guide price within two working days.

Get a Quote